Build a deck that lasts 20+ years

Time: 1–2 weeks
Materials: $3,000–$12,000
Difficulty: Advanced

A well-built deck is one of the best investments you can make in a home — it adds usable square footage and significant resale value. The key is getting the structure right: proper footings, correct joist sizing, and galvanized hardware throughout. The decking boards are the easy part.

Step-by-Step Guide

01

Plan and get permits

Check local codes for setback requirements, footing depth (below frost line), and railing height. Most decks over 30" off the ground require a permit. Submit plans before breaking ground.

02

Dig and pour footings

Dig holes below the frost line (typically 36–48" in cold climates). Use tube forms and pour concrete. Set post bases in wet concrete, checking for level and square. Let cure 48 hours minimum.

03

Install posts and beam

Set 4×4 or 6×6 posts in the post bases. Install the beam (doubled 2×10 or LVL) on top of posts. Check for level across the full span — this is your reference plane for everything above.

04

Hang joists

Install the ledger board to the house (through-bolt into rim joist, not siding). Hang joists 16" OC with joist hangers. Block the perimeter with rim joists. Check for square by measuring diagonals.

05

Lay decking boards

Start from the house and work out. Leave 1/8" gap between boards for drainage. Use hidden fasteners for a clean look, or face-screw with two screws per joist. Cut the outer edge with a chalk line for a clean finish.

06

Build railings and stairs

Posts must be bolted to the rim joist or blocking — never toe-nailed. Balusters must be spaced so a 4" sphere can't pass through. Stair stringers need proper rise/run calculation and solid footing at the base.

Pro Tips

Use structural screws (GRK or Spax) instead of nails for framing — they're stronger and easier to remove if you make a mistake.

Flash the ledger board meticulously — water infiltration behind the ledger is the #1 cause of deck rot and structural failure.

Buy 10–15% extra decking for waste from cuts and any boards with defects you'll want to reject.

Seal the end grain of all cut pressure-treated lumber with end-cut solution to prevent moisture absorption and checking.

Recommended Tools

★ Affiliate links — we may earn a commission at no extra cost to you.

DEWALT 20V Drill Combo Kit
Simpson Strong-Tie Post Bases
Kreg Jig Pocket Hole System

Materials Checklist

  • Pressure-treated lumber (ground contact rated for footings)
  • Concrete + tube forms for footings
  • Post bases (galvanized, Simpson Strong-Tie)
  • Joist hangers + structural screws
  • Decking boards (PT, composite, or hardwood)
  • Deck screws or hidden fasteners
  • Post caps and beam hardware
  • Ledger flashing (Z-flashing or self-adhesive)
  • Railing posts, balusters, and top rail
  • Stair stringers + treads

Calculate Your Materials

Enter your dimensions and get an exact materials list with quantities and cost estimates.

Open Estimator

Other Categories

Browse all categories